This is an end-to-end operating path, not a follow-up script or a dispatch checklist. A simple shared record, even if maintained manually, can carry the customer, approved scope, decision, schedule, and next owner from one stage to the next.
- 01
Inquiry
Qualify the new HVAC inquiry
Record the customer and best contact method, service address, equipment or system involved, reported problem, urgency, and preferred availability. Ask who can approve the work and whether there are access or safety details the technician should know.
- Checkpoint
- Confirm the address is in your service area, the right person can be reached, and the next step is clear. If a site visit is needed to diagnose the issue, say so instead of guessing at a repair or price.
- Next owner
- The office assigns the inquiry to the estimator or service professional who will confirm the scope.
- 02
Scope & estimate
Gather scope details and prepare the estimate
After the assessment, write down the observed condition, proposed work, equipment and materials, labor assumptions, access constraints, and any exclusions. Separate confirmed facts from items that still need inspection or customer approval.
- Checkpoint
- Before sending a price, compare the estimate with the confirmed scope and your current pricing. Make options, assumptions, exclusions, and any unresolved site question visible.
- Next owner
- The estimator sends the reviewed scope and estimate to the person who presents the proposal to the customer.
- 03
Proposal decision
Present the proposal and track the customer’s decision
Show the customer the included work, price, options, terms, and the way to approve or ask a question. Record which proposal version was sent, when it was sent, the customer’s current decision, and the next agreed contact date.
- Checkpoint
- Treat the job as accepted only when the customer has approved the current proposal version. If they ask for a change, revise the scope and proposal, then make the new version the one the team follows.
- Next owner
- Once approval is recorded, the sales owner passes the accepted proposal and customer commitments to scheduling.
- 04
Schedule
Schedule the accepted work
Check crew capacity, required skills, equipment, parts, and any permit or site prerequisites. Offer a realistic arrival window, confirm it with the customer, and record access instructions and the best day-of contact.
- Checkpoint
- The date or arrival window is confirmed with the customer, the crew and required materials are assigned, and any prerequisite still outstanding has an owner and due date.
- Next owner
- The scheduler sends the confirmed job details and open prerequisites to the field lead before dispatch.
- 05
Field handoff
Hand a field-ready job to the delivery team
Give the field lead the approved proposal version, job scope and exclusions, equipment and parts list, site and access notes, safety concerns, customer commitments, schedule, and any unresolved question. Keep the source documents with the job record.
- Checkpoint
- Ask the field lead to confirm the packet is complete before dispatch. If a scope, part, access detail, or customer expectation is unclear, assign someone to resolve it before the crew arrives.
- Next owner
- The field lead accepts ownership, briefs the assigned crew, and records any change that needs office or customer follow-up.
Brass Handoff · HVAC pilot
Explore the one-time HVAC pilot
The HVAC pilot is $179 paid upfront once for 30 days, with no automatic renewal. The separate, optional $249/month Launch Office offer is available only after explicit contractor opt-in. The pilot does not enroll you or start this monthly billing automatically. Asking about the pilot does not itself take payment.